ELECTRICAL SYSTEM

Transformer and high-/low-voltage electrical system installation

Survey, design, install, and improve electrical systems for homes, buildings, factories, and agencies by considering the load of the original system, area, and scope of related coordination.

Evaluate according to load

How much does it cost to install an electrical transformer?

The price does not depend on the size of the transformer alone. but includes equipment types, poles and bases, electrical wiring, cabinets and protective equipment, system orientation, civil works, legacy systems, and document scope or coordination. Therefore, the load and location must be surveyed before making a quotation.

Transformers and equipment

Consider the size from the calculated load. Complete with protection equipment and components suitable for the system.

Electrical system 3 phase

Evaluate the nature of the load, the main system, and the readiness of the power supply system. Do not conclude from building type alone.

Improve the original system

Check conditions, limitations, and connection points. To set safe and clear work boundaries

Service scope

Electrical work linked from source to load

  • Survey and collect electrical load data
  • Design high and low voltage electrical systems according to scope.
  • Install transformers, poles, equipment, and assembly systems.
  • Improve the main cabinet, distribution system, and connection points.
  • Inspected and tested before delivery
  • Coordinate documents according to duties specified in the contract.

Electrical system work must be carried out according to standards and regulations related to the area and type of project.

Electrical system and transformer installation work by PTH GREEN
steps

Survey, design, install and test

Get project information

Discuss goals, load legacy systems, location, and desired schedule.

Explore and define boundaries

Inspect the work site, evaluate options and determine the list of tasks that must be performed

Offer designs and prices

Prepare proposals to verify scope, equipment, price, and plans.

Install and deliver

Control work, inspect and test according to the agreed upon scope before delivery.

Frequently asked questions

Before installing the transformer and electrical system

Can the house be equipped with a 3 phase electrical system?

Electricity needs, internal systems, and conditions of local electricity providers must be assessed first. The team can help explore the system on site.

What documents must be prepared?

Documents depend on the type and scope of the project. Initially, there should be information about the property owner, electricity bill, building model or original system if any. and the list of loads to be used

Do you accept work from other provinces?

Accepting consideration of projects in the southern region and other areas according to the size and scope of work. Contact to send details for evaluation before scheduling a survey.

Send the electricity bill, load list, or the original to the team.

Preliminary assessment of electrical system boundaries before scheduling a survey.