PTH Green Company Limited · Hat Yai, SongkhlaCall 093-319-3448LINE ID: pthgreen
Home page / Wastewater Treatment Systems
WASTEWATER TREATMENT

Design a wastewater treatment system to suit the actual production process

Consulting services, design and control the wastewater collection and treatment system for the factory. By considering the quantity and characteristics of wastewater, area and goals of the project together

Select process from data

How many types of wastewater treatment systems are there? And which type should I choose?

There is no single system that works for every factory. Process selection, e.g. Activated Sludge or SBR aerated biological system Must be based on the type and concentration of pollutants, flow rate, fluctuation, area. and system operation pattern Do not choose based on the system name alone.

Collect data and explore

Understand the production process, waste water sources, and legacy systems and job site limitations

Set treatment guidelines

Consider process units and their dimensions in relation to design data and project goals.

Design and control work

Prepare engineering details Construction planning and control quality according to the agreed scope

Industrial wastewater treatment system area
Service scope

From new systems to analysis of existing systems

  • Provide consultation and survey information on site
  • Analyze treatment process options
  • Design collection and treatment systems
  • Establish guidelines for equipment, piping work, and related assembly work.
  • Control construction work and coordinate system testing.
  • Provide advice on system operation according to the project scope

Water quality and permit requirements must be considered according to the type of business. Area and laws in force at the time of the project

Frequently asked questions

Before starting to design a wastewater treatment system

Do I need to have water test results first?

Wastewater analysis results help make assessments more accurate. The team will consider together with the amount of wastewater. Production process and original system data

Do you accept improvements to the existing treatment system?

Considered according to the problem and scope of work. You should send the original water test results. and symptoms found for initial evaluation

Can the price be reported immediately?

Treatment system work requires knowing the design information and scope first. Estimated prices that are not based on on-site information may be highly inaccurate.

There is information on wastewater or the original system. Send it to the team to help consider.

Make an appointment to discuss project scope with PTH GREEN.

Call 093-319-3448
Call